Operations CXO Status Report

Friday 19 October 2001 12.00pm EDT

During the last week, Chandra completed the observing schedule as planned.

A real-time procedure was completed on Oct 16 that verified the CPE warm start count has remained unchanged at 1 since Mar 2. A second procedure was completed on Oct 18 to dump and verify values of the gyroscope scale factors and related variables. The dump and verification was done in preparation for an update to the scale factors.

The schedule of observations for the coming week is shown below.

------------------------------------------
PSS 0902+1640          ACIS-S        Oct 21
PSR B0833-45           HRC-I
Radiation Belts                      Oct 22
1RXS J1708-4009        HRC-I         Oct 23
NGC 7130               ACIS-S
PSR1813-36             ACIS-S
SAX J1806.5-2215       ACIS-S        Oct 24
IRAS 17208-0014        ACIS-S
CHVC125                ACIS-S
SDSS094108+594725      ACIS-S        Oct 25
Radiation Belts
MG J0414+0534          ACIS-S
HS0218+3707            ACIS-S        Oct 26
PSS0134+3307           ACIS-S
2MASSJ222202+1952      ACIS-I
M17                    ACIS-I
SAX J1747.0-2853       ACIS-S/HETG
SN1998BW               ACIS-S        Oct 27

------------------------------------------

All spacecraft subsystems continued to operate nominally.