Friday 6 November 2026 9.00am EST
During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on Nov 2 to perform an annual check-out of A-side MUPS thrusters, which are selected for use when Chandra is in its safe-mode configuration. Thrusters A2, A3, and A4 were fired and performed nominally. Thruster A1 was not fired due to the expected limited life remaining on it. Additional real-time procedures were executed on Nov 4 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE). The schedule of targets for the next week is shown below and includes an observation of SS443 coordinated with IXPE, and observations of V488 Sge, which are follow-ups to a Target of Opportunity accepted on Oct 26. |
------------------------------------------
V488Sge HRC-S /LETG Nov 9
SDSSJ014837.63+0600 ACIS-I
ORC1 ACIS-I
CHQJ0210+0050 ACIS-I
ORC1 ACIS-I
SDSSJ014837.63+0600 ACIS-I
V488Sge HRC-S /LETG Nov 10
CHQJ0210+0050 ACIS-I
Radiation Belts
NGC3079 ACIS-S Nov 11
QSOJ0344-0653 ACIS-S
SDSSJ085431.45+1217 ACIS-S
QSOJ0344-0653 ACIS-S
NGC6300_s2 ACIS-S Nov 12
BOSS0210E ACIS-I
2MASXJ18402764-5321 ACIS-S
BOSS0210C ACIS-I
GALEXASCJ180715.06- ACIS-S
BOSS0210C ACIS-I
Radiation Belts Nov 13
TYC6386-326-1 ACIS-S
HZ43 HRC-I /LETG
4C+21.55 ACIS-S
BOSS0210E ACIS-I Nov 14
SS433 ACIS-S/HETG
BOSS0210E ACIS-I
SS433 ACIS-S/HETG
SDSSJ014837.63+0600 ACIS-I
SS433 ACIS-S/HETG
SDSSJ014837.63+0600 ACIS-I
SS433 ACIS-S/HETG Nov 15
SDSSJ014837.63+0600 ACIS-I
SS433 ACIS-S/HETG
SDSSJ014837.63+0600 ACIS-I
SS433 ACIS-S/HETG
Radiation Belts------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports

