CXC Home | Search | Help | Image Use Policy | Latest Images | Privacy | Accessibility | Glossary | Q&A
Friday 8 May 2020 9.00am EDT
During the last week Chandra completed the observing schedule as planned. Real-time procedures were executed on May 7 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer and to perform a diagnostic dump of the Control Processing Electronics (CPE). A third real-time procedure was executed on May 8 to uplink two flight software patches. The first patch was to update the gyro calibration misalignment matrix and the second patch was to update the initialization values of the gyro bias vector. Additional real-time procedures were executed during each ground contact to reset the DSN Outage Dead Man Load. The schedule of targets for the next week is shown below. |
------------------------------------------
Radiation Belts May 10 CasACCO ACIS-S May 11 MKN501 ACIS-S 2MASXJ11110059-0053 ACIS-S May 12 NGC5728 ACIS-S F2M1118-0033 ACIS-S SPT-CLJ2323-5753 ACIS-I G349.7+0.2 ACIS-S Radiation Belts May 13 CasACCO ACIS-S UGC09448 ACIS-S May 14 J104457 ACIS-S NGC5728 ACIS-S J104642.5+022930.0 ACIS-S May 15 SNR0509-67.5 ACIS-S G349.7+0.2 ACIS-S Radiation Belts May 16 G1.9+0.3 ACIS-S SPT-CLJ2323-5753 ACIS-I May 17 RXJ1713.7-3946SW ACIS-I SPT-CLJ2323-5753 ACIS-I G1.9+0.3 ACIS-S May 18
------------------------------------------
All spacecraft subsystems continued to support nominal operations.
Return to Status Reports