News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 1 September 2017 9.00am EDT

During the last week the observing schedule was replanned to incorporate an observation of GRB170817A, which was accepted as a Director's Discretionary Time Target of Opportunity on Aug 29. Loads for the replanned schedule were uplinked on Aug 30. A scheduled observation of NGC7052 was impacted by the replan and will be will be rescheduled in a future week.

The schedule of targets for the next week is shown below.



------------------------------------------
Radiation Belts Sep 3 SDSS0051+0020 ACIS-S SPT-CLJ2344-4242 ACIS-I Sep 4 IRAS09002-4732 ACIS-I M30 ACIS-S RBS874 ACIS-S ACT-CLJ0034.4+0225 ACIS-I Sep 5 Radiation Belts M30 ACIS-S Sep 6 Radiation Belts Sep 8 CDWFS ACIS-I CDWFS ACIS-I NGC2537 ACIS-S Sep 9 ACT-CLJ0127.3+0021 ACIS-I IGRJ07202+0009 ACIS-I IRAS09002-4732 ACIS-I M30 ACIS-S Sep 10 CDWFS ACIS-I Radiation Belts

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports